All case studies
Manufacturing & Industrial
Bowhill Engineering
A look inside the business helping build the future of South Australia. Bowhill Engineering is manufacturing the steel sections for the cross-passages that link the twin tunnels of Adelaide’s Torrens to Darlington (T2D) project. We spent a day at their Murray River facility capturing the scale of the job, the precision of the robotic welding and the crew behind it. The result is a library ready for their website, LinkedIn, tenders and recruitment.
- Client
- Bowhill Engineering
- Industry
- Manufacturing & Industrial
- Services
- Photography
- Year
- 2026
- Location
- Bowhill, SA



















Need something like this?
Get content like this every month with The Content Department. Begin with a 48-Hour Kickstart and see your first content two days after we shoot.
